National Harbor, MD • August 27-29, 2025 |
WEDNESDAY, AUGUST 27 | |
1400 - 1800 | Exhibition Hall Open, Prince George C and D |
1400 - 1415 | Kick Off |
1420 - 1510 | U.S. Air Force - Tri-Service Mini Brief ![]() |
1520 - 1610 | U.S. Navy - Tri-Service Mini Brief ![]() |
1620 - 1710 | U.S. Army - Tri-Service Mini Brief ![]() |
1715 - 1800 | Sponsored Cocktail Hour |
Key
= Tri-Service Led
THURSDAY, AUGUST 28 | |||||||
![]() |
MOSA Innovations | Advanced Interoperability Standards | Testing for MOSA | Budget And/or Requirements |
AI, Digital Engineering and Strategic Practices | Dual-Use MOSA | Exhibition Floor |
![]() |
Baltimore 5 | Baltimore 1 & 2 | Baltimore 3 & 4 | Woodrow Wilson D | Woodrow Wilson C | Woodrow Wilson B | Exhibition Floor |
800 | Keynotes, Woodrow Wilson A | ||||||
930 | Coffee Break | ||||||
950 | MOSA Standards Success Stories | Leveraging MOSA for Platform Modernization ![]() |
MOSA and Intellectual Property and Data Rights (IP/DR)
![]() |
The Role of MOSA when Designing an AI Architecture for Avionics![]() |
TBD | ||
1000 | Exhibition Hall Opens (1000-1700), Prince George C and D | ||||||
1050 | MOSA Innovation Challenge | Exploring the Integration of SOSA™ and MOSA for Agile Sensor Systems* | MOSA in Munitions: Maintained Standards, Expertise, and 3rd Party Verification ![]() |
HOST, FACE, OMS, SOSA, CMOSS Open Standards Aligning - Critical Impact Yea or Nay ![]() |
MBSE Enabling Platform Environment | What Is “Open”, and Why Is It Important to MOSA? | |
1145 | Exhibit Hall and Networking, Prince George C and D | HOTT DEMO | |||||
1200 | Lunch (on own) | ||||||
1300 | MOSA Innovation Challenge |
What’s It All (MOSA) About: Navy Achievement Through Collaboration ![]() |
Unlocking the Potential of Open System Verification Demonstration (OSVD) | MOSA Attention Deficit Disorder (MOSA ADD) |
M&A As a Catalyst: Accelerating MOSA Adoption Through Strategic Acquisitions![]() |
Using The Future Airborne Capability Environment (FACE) for Adaptable and Reusable Software in a Safety-Critical Environment | |
1400 | MOSA Innovation Challenge |
Do We Sacrifice Security in Open Mission Systems Architectures? | MOSA Enables the Warfighter on the Joint All-Domain Battlefield ![]() |
What’s It Going to Take for MOSA to Be SOP? | Accelerating Digital Engineering Adoption with Generative AI | Using the Best Dual-Use to Set the Standard for Next-Gen Mission Planning Leveraging Spatial Computing, AI, Interoperability, and Scalability | |
1500 | MOSA Innovation Challenge |
Advanced Interoperability of Architectures and Standards ![]() |
Winning with MOSA Across the DoD![]() |
Model-Based Management of Mission Integration Management and MOSA Requirements | Leveraging MBSE to More Efficiently Support MOSA | MOSA for the Enduring Army Aviation Platforms: Following the FVL Framework ![]() |
|
1600 | Expo Reception, Prince George C and D | HOTT DEMO | |||||
1630 | HOTT DEMO | ||||||
1700 | Exhibition Closes |
Key
= Tri-Service Led
FRIDAY, AUGUST 29 | |||||
![]() |
Advanced Interoperability Standards | Testing for MOSA | Requirements and Budget for MOSA | AI, Digital Engineering and Strategic Practices | Dual-Use MOSA |
![]() |
Baltimore 1 & 2 | Baltimore 3 & 4 | Woodrow Wilson D | Woodrow Wilson C | Woodrow Wilson B |
800 | Keynotes, Woodrow Wilson A | ||||
930 | Sponsored Coffee Break | ||||
950 | How Container-Based Software Frameworks Enable Rapid Capability Enhancement in MOSA | Challenges and Approaches to Certification of Machine Learning for Safety-Critical Applications | Barriers to MOSA |
Tracing MOSA to Capability Requirements - Why MOSA Architecture Practices are Imperative to Mission Success and Safety of the Warfighter ![]() |
Everything’s interoperable until you plug it in – The business of MOSA Integration Hosted by: ![]() |
1050 | Applying MOSA to ISAM: Accelerating In-Space Assembly through Cooperative Open Processes | “Trust but Verify”, MOSA Conformance Activities, Open System Verification Demonstrations (OSVDs) ![]() |
Burden Shifting via MOSA: A Collaborative Path to Affordable Mass | Control Manager Design Pattern for MOSA Adoption | Building Adaptable Pharmaceutical Manufacturing Systems for Use in Space |
1145 | End of Conference |
Key
= Tri-Service Led
2025 MOSA SPONSORS & PARTNERS
2024 MOSA & SPACE SPONSORS
2024 TECHCONNECT SPONSORS & PARTNERS
2024 TECHCONNECT AGENCY PARTNERS
Produced by: ![]() |